Ausur – Autopista del Sureste
Services: Demand and Technique
Type of project: Roads
Location/Country: Spain
Description + Metrics: Section of the Mediterranean Highway (A7) of approximately 75 km with a shadow toll between Crevillente (Elche) and Cartagena. Concession period 50 years. The highway has 23 links, an 800 m cut-and-cover tunnel and three large viaducts over boulevards. The project has two trunk toll areas (Zenia and Montesinos) and a lateral toll area (Zenia lateral).
Demand: Advice in the non-binding offer delivery phase (NBO – No Bidding Offer). Analysis of historical patterns and trends of users and statistical analysis against macro and microstrategic explanatory variables. Preparation and definition of infrastructure user projections, including the development of scenarios and specific singularities per project.
Technique: Advice in the non-binding offer delivery phase (NBO – No Bidding Offer). Study and review of the technical and operational conditions of the infrastructure. Monitoring of the evolution of the project and compliance with the operational requirements contractually required. Assessment of the OpEx and CapEx projections of the concession company and estimation of adjustments and sensitivities. Compliance with KPIs from the point of view of the ordinary operation of the asset, ESG and the reversal at the end of the concession contract.





