Carretera Toluca Naucalpan
Services: Technique
Type of project: Roads
Location/Country: Mexico
Description + Metrics: Inaugurated in 2020, the highway has c.40km of high-capacity roads in a highly complex orography that required the construction of more than 5km of bridges and viaducts, some with heights greater than 100 meters, and up to 1 kilometer of tunnels .
Total investment of c.11m Mexican Pesos.
Technique: Study and review of the technical and operational conditions of the infrastructure.
Monitoring of the evolution of the project and compliance with the operational requirements contractually required.
Assessment of the Opex and Capex projections of the concession company and estimation of adjustments and sensitivities.
Compliance with KPIs from the point of view of the ordinary operation of the asset, ESG and the reversal at the end of the concession contract.

![42_Carretera Toluca Naucalpan_0000_TONAU_1[1]](https://a3i-infra.com/wp-content/uploads/2023/06/42_Carretera-Toluca-Naucalpan_0000_TONAU_11.jpg)



