Portfolio de Itinere

Services: Demand and Technique

Type of project: Roads

Location/Country: Spain

Description + Metrics: Road portfolio in Spain. Shadow toll. AP9 220 km between Ferrol and Vigo; AP1 84 km between Burgos and Vitoria; AP66 87 km between León and Asturias; AP15 113 km between Pamplona and Valladolid; AG55 33 km between A Coruña and Carballo; AG57 25 km between Vigo and Baiona.

Demand: Analysis of historical patterns and trends of users and statistical analysis against macro and microstrategic explanatory variables. Preparation and definition of infrastructure user projections, including the development of scenarios and specific singularities per project.

Technique: Study and review of the technical and operational conditions of the infrastructure. Monitoring of the evolution of the project and compliance with the operational requirements contractually required. Assessment of the OpEx and CapEx projections of the concession company and estimation of adjustments and sensitivities. Compliance with KPIs from the point of view of the ordinary operation of the asset, ESG and the reversal at the end of the concession contract.